• Bawitik Power Corporation is proposing a 3.0 MW hydroelectric station located in Selwyn Township, Peterborough County, approximately 2 km south of the Town of Lakefield on the westerly shore of the Otonabee River, adjacent to the existing dam at Lock 25 of the Trent-Severn Waterway.